Laser Survey and 3D Model for a Food Production Boiler Plant Upgrade.

Sector
Food production
Location
United Kingdom
Scope
Live process area and new boiler plant site
Services
3D laser scanning, Plant 3D modelling and Cintoo

01 · The problem

A new boiler plant, tied into a live production area

A food production facility was adding a new boiler plant. Its piping designers needed the process area scanned and modelled so they could check new pipe runs for clashes and find their tie-in points.

The site had to keep running throughout the survey. The design team was based a long way from site, so they needed data they could work from remotely, inside their own Autodesk set-up, without repeated site visits.

What they needed

  • A model to check new pipe runs for clashes
  • Tie-in points on the existing pipework
  • Scan data inside their Autodesk BIM Collaborate Pro set-up
  • A way to see the site without travelling to it
  • No disruption to live production

02 · Our solution

Scan inside and out, then model anything that could clash

Our two-person team scanned the process area and the external boiler plant location in three days. We modelled it in AutoCAD and Autodesk Plant 3D, and put the whole site online in Cintoo.

We modelled more than the pipework. Primary steelwork, concrete walls, floors, the roof and equipment were all included, so anything that could clash with a new pipe run was in the model.

To keep the cost down, around 90 to 95 percent of the modelling was done in AutoCAD, with the tie-in points modelled in Plant 3D using the client's own specs. We worked through those specs with their design team to confirm what was on site and what the new pipework would tie into. Read more about our 3D laser scanning and 3D process models.

03 · How it was done

Three days on site, six weeks to a finished model

  1. 1

    Scan

    Over 250 scans in three days with a Trimble X7. We worked with the control room to scan areas while they were quiet, so production kept running.

  2. 2

    Register

    Outside and inside were linked through several connection points rather than one way in, for a more accurate registration. Cleaned and converted to Autodesk ReCap in one to two days.

  3. 3

    Model

    Areas modelled in the priority order the designers needed, split into separate area models so each file stayed workable, on a coordinate system set up to suit Plant 3D.

  4. 4

    Check and hand over

    Every model passed our three quality checks before handover, followed by a meeting to walk through the scan data and what both teams had learned.

04 · The outcome

Every requirement ticked off

With the whole site in Cintoo, the designers started working out clashes and tie-ins before the models arrived, and the priority areas reached them first.

They held meetings by walking the scan online and taking measurements, and only needed to visit site once or twice. Our experience on oil, gas and chemical storage sites meant the survey ran safely around a live production line.

What we delivered

  • Clash-ready model of pipework, steel, walls, floors, roof and equipment
  • Tie-in points modelled in Plant 3D using their own specs
  • Scan data in Autodesk ReCap for their BIM Collaborate Pro set-up
  • The whole site online to walk and measure in Cintoo
  • Survey completed safely with production running

3 days

On site with a two-person team

250+

Scans inside and outside the plant

6 weeks

From point cloud to checked models

1 to 2

Site visits needed by the designers

One lesson for next time

The new boiler plant meant moving external kit and some car parking bays, so the client had a separate total station survey done by another firm, on a different coordinate system to ours. Had we scanned the car park at the same time, all the data would have been captured together and sat on one coordinate system.

For their next site, the aim is to capture the whole lot in one survey.

In their words

What the project manager said

“

Our designers were working through clashes before the models even arrived.

Project Manager

Food production facility

Full feedback

Neonex turned the survey and models around quickly. Having the whole site in Cintoo meant our designers were working through clashes and tie-ins before the models even arrived, and the priority areas came through first. The team worked safely around a live production site and kept us informed throughout.
  • Quick turnaround
  • Safe on a live site
  • Priority areas first
  • Site online in Cintoo

Your project

Adding new plant to a live site?

If your designers need to know what is already there before they route new pipework, we can scan it, model it and put it online so they can start straight away. Scope the car park and external areas too, and it all comes back on one coordinate system.

Talk to us about your site

Tell us what you are planning and we will tell you what we would scan, what you would get and how long it would take.

Start a conversation
Neonex Digital Transparent White Logo
Neonex Digital Ltd.
Registered in England and Wales, company number 16047925.

Registered office: The Mousery, Beeches Road, Battlesbridge, Essex, SS11 8GH.
© 2026 Neonex Digital Ltd. All Rights Reserved. | Privacy Policy