01 · The problem
A food production facility was adding a new boiler plant. Its piping designers needed the process area scanned and modelled so they could check new pipe runs for clashes and find their tie-in points.
The site had to keep running throughout the survey. The design team was based a long way from site, so they needed data they could work from remotely, inside their own Autodesk set-up, without repeated site visits.
What they needed
02 · Our solution
Our two-person team scanned the process area and the external boiler plant location in three days. We modelled it in AutoCAD and Autodesk Plant 3D, and put the whole site online in Cintoo.
We modelled more than the pipework. Primary steelwork, concrete walls, floors, the roof and equipment were all included, so anything that could clash with a new pipe run was in the model.
To keep the cost down, around 90 to 95 percent of the modelling was done in AutoCAD, with the tie-in points modelled in Plant 3D using the client's own specs. We worked through those specs with their design team to confirm what was on site and what the new pipework would tie into. Read more about our 3D laser scanning and 3D process models.

03 · How it was done
1
Over 250 scans in three days with a Trimble X7. We worked with the control room to scan areas while they were quiet, so production kept running.
2
Outside and inside were linked through several connection points rather than one way in, for a more accurate registration. Cleaned and converted to Autodesk ReCap in one to two days.
3
Areas modelled in the priority order the designers needed, split into separate area models so each file stayed workable, on a coordinate system set up to suit Plant 3D.
4
Every model passed our three quality checks before handover, followed by a meeting to walk through the scan data and what both teams had learned.
04 · The outcome
With the whole site in Cintoo, the designers started working out clashes and tie-ins before the models arrived, and the priority areas reached them first.
They held meetings by walking the scan online and taking measurements, and only needed to visit site once or twice. Our experience on oil, gas and chemical storage sites meant the survey ran safely around a live production line.
What we delivered
3 days
On site with a two-person team
250+
Scans inside and outside the plant
6 weeks
From point cloud to checked models
1 to 2
Site visits needed by the designers
The new boiler plant meant moving external kit and some car parking bays, so the client had a separate total station survey done by another firm, on a different coordinate system to ours. Had we scanned the car park at the same time, all the data would have been captured together and sat on one coordinate system.
For their next site, the aim is to capture the whole lot in one survey.
In their words
“
Our designers were working through clashes before the models even arrived.
Project Manager
Food production facility
Full feedback
Neonex turned the survey and models around quickly. Having the whole site in Cintoo meant our designers were working through clashes and tie-ins before the models even arrived, and the priority areas came through first. The team worked safely around a live production site and kept us informed throughout.
Your project
If your designers need to know what is already there before they route new pipework, we can scan it, model it and put it online so they can start straight away. Scope the car park and external areas too, and it all comes back on one coordinate system.
Tell us what you are planning and we will tell you what we would scan, what you would get and how long it would take.
Start a conversation