Speed
An experienced surveyor completes 70 to 80 scans in a clear eight hour day, or 50 to 60 on busy, access restricted sites.
01 · The basics
3D laser surveys measure every visible surface on your site with a tripod mounted laser scanner. The result is a registered point cloud: millions of measured points that reproduce the site in 3D, usually with panoramic images from every scan position.
You may also hear them called laser scanning surveys or point cloud surveys.
Because the scanner records everything in its line of sight, your engineers can often measure from the existing point cloud when the next project comes up, instead of sending someone back to site.
A typical survey includes

2.4 mm
Scanner accuracy at 10 m
4 days
To scan a 75,000 m² fuel terminal
70 to 80
Scans in a clear eight hour day
25+ years
In oil and gas, with 15+ in laser scanning
02 · See one
Rotate and zoom around this sample. It shows the kind of registered point cloud, with measurements and asset tags, that our 3D laser surveys produce.
Registered point cloud from one of our surveys. Click the image to load the interactive viewer.
03 · The value
A tape or total station survey records the points someone chose to measure. A laser survey records everything in view.

An experienced surveyor completes 70 to 80 scans in a clear eight hour day, or 50 to 60 on busy, access restricted sites.
Our Trimble X7 is specified at 2.4 mm 3D point accuracy at 10 m, with automatic calibration and self levelling.
One visit serves engineering, maintenance and compliance teams, and next year's questions can often be answered without going back.
The scanner measures from a distance, reducing work at height and near live plant. Its Class 1 laser is classed as eye safe.
Every setup records a full 360 degree view, so even on a one skid job the plant around it is captured too, ready for the next project.
Neonex Digital guided us through our survey requirements and delivered a solution perfectly tailored to our project's needs, we look forward to working with them again.
04 · The process
Our 3D laser surveys follow the same five steps on every site.
1
We agree the deliverables, the accuracy each one needs and any site coordinates the data must tie into, then book inductions and permits. Our guide on how to prepare your site for laser scanning covers the practical side.
2
We start at the far corner of the site so the first area sets a fixed datum. Each setup is planned to see behind vessels and racks and to cover the blind circle under the last one.
3
Each Trimble X7 scan takes roughly 2 to 7 minutes, plus 1 to 2 minutes for images or 2 to 6 for HDR. We follow your permit to work system, using site gas monitors and radios wherever an area requires them.
4
Scans are joined with targets or cloud to cloud matching, and we check every alignment by hand. Repetitive layouts, like a row of evenly spaced tanks, are where software can drop a scan in the wrong place.
5
On multi day surveys we export the first registered area after day one or two, so modelling and P&ID work starts while we are still on site.
Scan to model
The registered point cloud on one side, the finished Plant 3D model on the other. Every pipe, valve and vessel in the model is fitted to what the scanner measured.
05 · The outputs
Every output below comes from the same point cloud, so they agree with each other and with the site.
3D process models
Pipework and equipment built in Autodesk Plant 3D
Smart P&IDs
Following your site's symbols, borders and nomenclature
Piping isometrics
For fabrication, inspection and line records
Tank geometry reports
Storage tank analysis against EEMUA 159 and API 653
CAD drafting
GA, electrical and as-built drawings drafted from the point cloud
The same data also gives you orthographic general arrangements, bund volume calculations, virtual tours, and as-built steel, MEP BIM, measured building and topographical surveys.
Real example
75,000 m²
Fuel storage terminal in mainland Europe
4 days
To scan the whole site
30
Storage tanks
9
Road loading bays, plus 2 pump slabs
A 75,000 m² fuel storage terminal in mainland Europe took four days to survey. The point cloud produced nine deliverables, including a Plant 3D model, smart P&IDs, API 570 piping isometrics, bund volumes and tank condition analysis. A virtual tour of the same data has cut the client's site visits by up to 50%.
06 · The accuracy
Two numbers decide the accuracy of 3D laser surveys: how precisely the scanner measures from one position, and how well all the positions fit together once registered. Brochures quote the first. The second decides how well your model lines up.
1
The Trimble X7 is specified at 2.4 mm at 10 m, 3.5 mm at 20 m and 6.0 mm at 40 m.
2
The error between overlapping scans, shown in the registration report as overall error, overlap and confidence per scan pair. See our guide to scan to scan deviation.
3
Design and analysis work needs tight tolerances, while some jobs only need 3 to 5 mm, which saves time on site.
What the scanner cannot see: the X7 covers 360 degrees horizontally and 282 degrees vertically, leaving a cone under the tripod it cannot measure. At 1.5 m above the floor, that blind circle is about 2.4 m across. Anything behind a vessel or pipe rack is hidden too, so overlapping setups are planned to fill both gaps.
07 · Before you book
Quotes for 3D laser surveys of the same site can vary widely because they are not always for the same thing. Ask these five questions to compare like with like.
1
Some surveyors keep it and hand over only drawings, tying every future job to them. Ask for E57, an open format, plus RCP or LAS if your software needs them, and a RAW copy.
2
It proves the scans fit together. Ask for the average and maximum error.
3
Handheld SLAM is quicker on the ground but less accurate than tripod scanning, so two prices can be for two different products.
4
Permits, gas testing and plant movements decide how many scans get done in a day.
5
A hard drive costs almost nothing, while a hosted online viewer is a running cost, itemised or not.
Further reading
Our laser scanning articles cover planning a survey, preparing your site, accuracy, file formats, costs and scanning in DSEAR zones.
08 · Your questions
The questions we are asked most often. If yours is not here, get in touch.
It depends on area, congestion and access. As a guide, the 75,000 m² terminal above took four days, and on multi day jobs the first registered area can reach your designers after day one or two.
There is no fixed rate per square metre. Crew size, tripod or handheld scanning, access, data ownership and delivery all move the price, so we quote per site. Our 3D laser scanning cost guide explains each factor.
Usually E57, an open ASTM standard most software can read, or Autodesk RCP and RCS files for ReCap, AutoCAD, Revit and Navisworks. LAS suits GIS work. Models and drawings come in your CAD format.
Yes, terrestrial laser scanning is a form of LiDAR, as it measures distances with laser light. A tripod scanner works close up for fine detail, while airborne LiDAR covers large areas from the air at a lower point density.
It only records what is in its line of sight, and each setup leaves a blind circle under the tripod. Overlapping scan positions fill those gaps, and noise from rain or standing water is cleaned up during processing.
Site safety
Process sites run on permits, and our surveys fit around them. Neonex Digital is CHAS Elite accredited, surveys are led by a CCNSG Safety Passport holder, and we work within your permit to work from induction to sign off.
Send us the site and what the survey is for, and we will come back with questions or a quote.