01 · The basics
An as built P&ID is a piping and instrumentation diagram that shows the plant exactly as it is installed, not as it was designed. It records every line, valve, instrument and piece of equipment, with tags and line numbers that match the labels on site.
A design P&ID shows what the engineers intended to build. An as built P&ID shows what the contractor actually installed, including the changes made on site: rerouted lines, extra vents and drains, swapped valve types, spec breaks in different places and instruments added after commissioning. Once it is checked against the plant, the sheet is issued at an as built revision, and every later change is drawn onto it under management of change.
Your P&ID drawings are the reference for maintenance, isolations, inspections and project work. When they are wrong, every one of those jobs starts from a wrong picture.
What an as built P&ID records

3 checks
On every sheet before it is issued
4 days
On site for a small tank terminal
600+
P&IDs drawn for a single chemical terminal
25+ years
In oil and gas, with 15+ in laser scanning
02 · See one
This is a section of a real process site we have scanned, the same kind of data our designers work from when they draw P&ID drawings. Every pipe, valve, flange and instrument is captured to within a few millimetres, so a line that disappears into a rack or runs at height can still be traced from the office.
Rotate, zoom and pan to look around. When a question comes up during drafting, such as where a drain sits or which way a valve faces, the designer checks it here instead of sending someone back to site.
03 · The problem
Most sites change faster than their drawings. After ten or twenty years, a set can be a mix of original design drawings, scanned paper and AutoCAD files in different styles.

Changes go in under management of change, but the drawing update never quite follows.
Marked up sheets sit in a site office and never reach CAD.
Tie ins drawn on the contractor's own sheets, or not drawn at all.
Original design drawings, scanned paper and AutoCAD files, each in a different style.
Once a set has drifted this far, a new survey makes more sense than another round of redlines.
Neonex Digital guided us through our survey requirements and delivered a solution perfectly tailored to our project's needs, we look forward to working with them again.
04 · The process
We combine a 3D laser scan with a walkdown by surveyors who draw P&IDs for a living. Drafting starts after the first day on site, so drawings and survey run side by side.
1
We set symbols, line and equipment numbering, title blocks and borders with you, or follow your existing standard.
2
We laser scan the process areas and walk every line with marked up drawings, including remote E&I instrumentation the scanner cannot read.
3
Process pipework is modelled in Plant 3D from the point cloud, so routes, valves and connections are checked against measured data rather than memory.
4
Our lead designer drafts each system as a smart P&ID. For tank terminals we add a side elevation sheet per tank, linking roof instrumentation to the inlet and outlet valves.
5
The surveyor who walked the area checks first, a second checker who has never seen the drawing checks again, then a final check before issue.
6
You get the Plant 3D project, DWG and PDF sheets, plus line, valve and instrument lists if you need them.
Scan to model
The registered point cloud on one side, the finished Plant 3D model on the other. Every pipe, valve and vessel in the model is fitted to what the scanner measured.
05 · The outputs
Our P&ID drawing services deliver every job as smart P&IDs in Autodesk Plant 3D, because the data behind the drawings is what produces your lists and registers.
Smart P&IDs
In a Plant 3D project, with every tag linked to the data behind it
PDF to smart P&ID
Old PDFs and plain AutoCAD sheets converted as part of the update
Line, valve and instrument lists
Exported from the same data, plus an asset register if you need one
3D process model
The pipework model we check against, finished as a full Plant 3D model
Point cloud
The registered laser scan, yours to keep for future projects
If your site works in plain AutoCAD, you still get standard DWG and PDF sheets in your border and title block. They are a straight export from the smart P&ID, so there is no redrawing and no extra cost.
Cost
£500+
Per P&ID sheet, up to £1,500, all three checks included
Per day
Site survey, priced per site day
4 days
On site for a small terminal
2 to 3 wks
On site for a large one
The cost of P&ID drawings depends on three things: the site survey, any E&I survey, and the drafting. A simple tank sheet sits at the low end, a busy manifold or process unit at the high end. Where remote instrumentation, junction boxes and control loops need recording, an E&I surveyor traces them back from the field. Travel outside London is quoted separately, and redline updates to existing sheets cost less than new drawings.
06 · Walkdown or scan
It depends on how far your drawings have drifted and what you will use them for next. A walkdown on its own suits small, simple areas. Adding a laser scan costs more on day one but stops the return visit when a line cannot be traced.
1
A surveyor walks every line with the current drawings, tracing pipework by eye. Quickest to start and best for a few systems or a small, open area, but hard going in racks, at height or in congested plant.
2
The same walkdown, backed by a 3D scan. Lines in racks and at height are traced from measured data, anything missed is checked from the office, and you keep the point cloud and a Plant 3D model.
3
Only a few known changes? We can redraw your marked up sheets without a survey.
For full sites, congested plant and upcoming project work, we recommend the walkdown plus scan.
07 · Compliance
Most process safety duties assume your drawings match the plant. These are the ones that lean on them hardest.
1
The written scheme of examination relies on knowing every pressure system and its protection (HSE guidance).
2
Major hazard sites must show they understand their plant.
3
We supply the drawings that DSEAR studies are built on. We do not carry out the studies.
4
A study is only as good as the drawings it reviews.
5
Workplace safety rules and Environment Agency permits all assume your drawings match the plant.
Gallery
Further reading
Our P&ID series starts with what a P&ID is and works through each part of the drawing, from borders and equipment to pipelines, instrumentation and standards, then on to smart P&IDs.
08 · Your questions
The questions we are asked most often. If yours is not here, get in touch.
Yes. We can survey one system or one area and redraw just those sheets in your existing standard, so they match the rest of the set.
We follow your site standard where one exists. Otherwise we draw to ISO 10628 symbols with a clear legend sheet; see our P&ID standards guide.
Yes. Our surveyors work on operating COMAH sites under your permit system, and we have scanned in DSEAR zones 1 and 2 (how we do it). Gas monitors are supplied by site.
Yes. We sign NDAs, and any drawing work shared with our wider team has client names and borders removed until the final issue.
Yes. The pipework model we build to check the P&IDs can be finished as a full Plant 3D process model, with isometrics and orthographic drawings.
Drafting starts after the first day on site, so you see the first drawings while we are still surveying. A small terminal can take 4 days on site, while a large site can take 2 to 3 weeks. We give you a programme with the quote, so you know when each area's drawings will arrive.
Keeping them current
Once each sheet is checked against the plant, it is issued at an as built revision, so every later change can be drawn onto it under management of change.
Send us the site and your current drawings, and we will come back with questions or a quote.
Talk to us about your P&IDsWe can help you:
Book a free 20-minute P&ID consultation